China (Mainland)
Address:Caoyang Road 540, Zhonglian Building,Room 203
Contact:Kitty Weng
Tel:86-21-62441919
Fax:86-21-62442188
Type:Manufacturers
|
Applications · On return air ducts to measure return air humidity · On supply air ducts to measure supply air humidity · On fresh air ducts to measure outdoor ari humidity. Humidity Tansmitter The transmitter measures the humidity by the honeywell humidity sensor HIH-3610. The transmitter analog output may be be 0-10V or 4-20mA. And the transmitter include a noise filter.the power suply is large range VDC18V----VDC30V.The humidity transmitter measurement range is 5%-95%. linearity Signal output:
OrderingOrdering number:RH-5I-D or RH-5I-D-T -5 indicates the humidity transmitter accuracy is 5%; -3 indicates 3%, -2 indicates 2%. -I indicates the humiditt transmitter signal out is 4-20mA. If –U indicates the signal is 0-10V. -T indicates the humidity transmitter integration with temperature signal out. For example:RH-5I-D-T The duct humidity transmitter signal out is 4-20mA and the temperature signal out is 4-20mA. InstallationDuct probes should be installed directly on the duct, in an area where the air stream is well mixed: · Locate a supply air sensor two or three meters down stream from the nearest fan and coil. · Mount the return air sensor close to the air inlet but downstream from a return fan if one is present. · To install the sensor, assemble base plate and probe, then drill a 12 mm hole and two 3 mm holes on a diameter of 25 mm in the duct. · Use two self-tapping sheet metal screws to tighten the mounting circuit in the cover. · Connect the wires according to the wiring diagram to the measuring circuit in the cover: o Only the humidity transmitter signal out need three terminal connections,DC24V,Ground and humidity signal out. o If humidity and temperature transmitter signal out need for terminal connections,DC24V,Ground,humidity signal out and temperature signal out. o The connection signal cable should be shield wires. · Assemble the cover with the mounting plate. · Insert the assembled probe through the center opening of the mounting plate into the air stream. · Tighten the horizontal screw on the mounting plate to fix the probe to the duct.
Technical Specification
Wire diagram |
About Us - Service - Payment - Links - Contact Us - Sitemap - Message - Add to favorite
[Hangzhou]86-571-85317628,85317625,85459719,85459303 ©2010 seekpart.com,License:
